Monday 17 August 2026
Melbourne Weather News

Local News, Melbourne. Every Day.

Multiple Sources. Transparent Technology.

news

Box Hill Schools Plan Phased Openings, Complete 2028 Move to Terry Road

Box Hill Public School and the incoming high school face phased openings followed by a move to permanent Terry Road facilities in 2028.

By Box Hill News Desk · Published 25 July 2026

How we reported this

This article was written by AI from the linked sources and was not reviewed by a journalist before publishing. Melbourne Weather News is part of The Daily Network and follows our reasonable editorial care.

Box Hill High School will open in temporary facilities on Day 1, Term 1, 2026, starting with Year 7 students only before adding Year 8 in 2027 at a capacity of 300 students.

The primary school already began operations in temporary facilities on Day 1, Term 1, 2025, with an initial intake of 300 students from Kindergarten to Year 2 that grew to 600 students by Term 3, 2025. These timelines follow directly from the rapid rise in local demand after Box Hill's student population increased by over 1,000 percent between 2018 and 2023.

High School Phased Rollout

The temporary Box Hill High School will begin solely with Year 7 in early 2026. Expansion to include Year 8 occurs the following year while remaining within the 300-student limit at the temporary location. This staged approach allows the NSW Department of Education to manage enrolment growth without immediate pressure on permanent infrastructure.

Transition to Permanent Facilities

Both the primary and high schools are scheduled to shift to permanent buildings at Terry Road, Box Hill, on Day 1, Term 1, 2028. The move forms part of a $3.9 billion NSW Government investment in Western Sydney schools. The George Street temporary site currently used by the primary school will remain under NSW Department of Education ownership for future school purposes once the Terry Road campus opens.

Decisions Facing Families and Planners

Parents must track enrolment pathways for the 2026 high school intake and the 2028 relocation, as both schools will operate from temporary sites until the permanent Terry Road facilities are ready. The Department of Education will retain the George Street site, creating options for additional future capacity rather than immediate disposal of the temporary infrastructure. Local planning now centres on ensuring smooth transitions between the 2026 high school opening, the 2027 expansion, and the 2028 permanent move without disrupting existing student cohorts.

References Sourced but Not Limited to:

Beta · AI-assisted · human oversight

Your newsroom. Shaped by you.

Melbourne Weather News is in beta. AI may assist with research, summarising and drafting. Automated checks assess sourcing, accuracy and editorial risk before publication, and sensitive material is held for human review. Spotted something off, or want us covering a topic? Tell us. Your feedback is entirely optional and helps shape what we publish next.

The Daily Network · local news across AUS