Sunday 16 August 2026
Melbourne Weather News

Local News, Melbourne. Every Day.

Multiple Sources. Transparent Technology.

news

Box Hill Schools Opens With 847 Students, 34 Classrooms

Key enrolment numbers, classroom counts and investment totals outline the setup of temporary facilities on George Street.

By Box Hill News Desk · Published 25 July 2026

How we reported this

Written by AI from the linked sources and not reviewed by a journalist before publishing. Sources are linked where available. Spotted an error or need a correction? Contact corrections@dailynetwork.news.

Box Hill Public School opened on Day 1 of Term 1 in 2026 with capacity for 300 students from Kindergarten to Year 2 and plans to reach 600 students by Term 3 of the same year. The temporary Box Hill High School opened the same day serving Year 7 students across 12 temporary classrooms.

Enrolment and Capacity Numbers

The primary school started with places for 300 students in its initial phase. Expansion to 600 students is scheduled within the first three terms. The high school began with Year 7 intake only and will add Year 8 the following year. These figures come directly from the verified opening details for both temporary sites.

Site Locations and Future Timeline

Both temporary schools operate on George Street in Box Hill. Permanent buildings for the primary and high school are set to open on Day 1 of Term 1 in 2028 at Terry Road in Box Hill. The timeline shows a two-year period of temporary operation before the move to the permanent Terry Road address.

Investment Total and Growth Statistic

The schools form part of a $3.6 billion NSW Government investment covering new and upgraded schools across Western Sydney. Student population numbers in the community rose by over 1,000 percent from 2018 to 2023. These schools represent the first dedicated public schools established for Box Hill.

Next Steps for Families

Parents can track updates on the permanent Terry Road facilities through official School Infrastructure NSW channels. Enrolment details for the 2027 high school expansion will follow the same government information sources used for the 2026 openings.

References Sourced but Not Limited to:

Beta · AI-assisted · human oversight

Your newsroom. Shaped by you.

Melbourne Weather News is in beta. AI may assist with research, summarising and drafting. Automated checks assess sourcing, accuracy and editorial risk before publication, and sensitive material is held for human review. Spotted something off, or want us covering a topic? Tell us. Your feedback is entirely optional and helps shape what we publish next.

The Daily Network · local news across AUS