Politics
Broadmeadows Activity Centre Plan Sets New Building Height Standards
New planning directives outline building height limits and streamlined application pathways for future housing growth.
How we reported this
The finalized Broadmeadows Activity Centre Plan is set to guide the direction of local development over the next 10 to 30 years, according to planning documentation. The policy establishes specific standards for property development, including height restrictions for new buildings within the core and surrounding catchment areas. These rules are designed to balance the objective of increasing housing capacity with regional infrastructure and aeronautical requirements.
A central feature of the new framework is the implementation of a streamlined 'deemed to comply' pathway for planning applications. This process removes the need for notice and review requirements for most proposals in the activity centre core, provided that the projects strictly adhere to mandated height, street wall, and setback standards. For residents and local property owners, this represents a significant shift in how development proposals are processed in the area.
Building Heights and Housing Growth
The policy mandates a tiered approach to building heights. In the commercial core, new buildings are envisaged to reach heights of up to 12 storeys, or 40 metres. However, these structures remain subject to obstacle limitation surface restrictions associated with the nearby Essendon Fields Airport. On larger lots exceeding 1,000 square metres within the core, height limits are set at 6 storeys. In the surrounding catchment areas located within 10 minutes of the train station, development is capped at 4 storeys.
Strategic planning documentation highlights that specific rules prevent the construction of taller buildings directly under airport flight paths. This regulation necessitates a gradual decrease in building heights as the distance from the commercial core increases, ensuring that development remains compatible with aviation safety. The overall strategy is projected to contribute between 3,000 and 4,500 new homes to the area over the duration of the plan.
As these guidelines transition into practice, the focus remains on the long-term integration of new residential capacity. Residents and developers can expect these regulatory standards to dictate the physical form of future construction projects within the designated activity centre boundaries. The shift to a 'deemed to comply' model is intended to provide greater clarity for those navigating the planning system, while the tiered height restrictions will shape the density of the local environment for the coming decades.
Produced with AI assistance and reviewed against our editorial standards. Sources are linked where available. Spotted an error or need a correction? Contact corrections@dailynetwork.news.