Monday 17 August 2026
Melbourne Weather News

Local News, Melbourne. Every Day.

Multiple Sources. Transparent Technology.

Politics

Bundoora Tram Route to Reach Harbour by 2026 Under New Policy

Bundoora residents may see a new tram service from Bundoora RMIT reach the harbour area by 2026 under the current transport policy timeline.

By Bundoora Policy Desk · Published 25 July 2026

How we reported this

This article was written by AI from the linked sources and was not reviewed by a journalist before publishing. Melbourne Weather News is part of The Daily Network and follows our reasonable editorial care.

Bundoora Tram Route to Reach Harbour by 2026 Under New Policy
Photo by philip.mallis / flickr (by-sa)

The transport policy review includes a new tram route from Bundoora RMIT to the harbour area, with completion targeted by 2026. This route forms part of the measures outlined in the policy documents for local transport links.

Current Bus Performance Data

Buses remain the second slowest transport mode in the area. Data show that only 42% of bus routes operated above benchmark utilization in 2018 and 2026. These figures provide the baseline for assessing how existing services perform for daily travel to work and other local destinations.

The transport strategy sets a target to raise the combined share of public transport, walking and cycling trips to 70% of all journeys. It places emphasis on lowering the proportion of car trips to work within municipalities that include Bundoora. Residents who currently rely on buses or cars for commuting would be the primary group affected if these mode-share shifts occur.

Expected Congestion and Next Steps

Strategic modelling prepared as part of the policy review addresses congestion levels projected to rise between 2026 and 2036. The modelling examines options under the Better Buses program and how they might interact with the new tram route once it opens.

The 2022 Transport Standards Review established national reporting frameworks for compliance with transport standards. These frameworks are referenced in the current policy documents as the basis for tracking progress on the tram route and bus improvements. Residents can monitor updates through official policy channels as the 2026 completion date approaches, with any changes to service patterns communicated closer to that time.

Policy documents also note that forward projections remain subject to the outcomes of ongoing modelling work. No specific interim dates for partial service changes have been set beyond the overall 2026 target for the tram route.

References Sourced but Not Limited to:

Beta · AI-assisted · human oversight

Your newsroom. Shaped by you.

Melbourne Weather News is in beta. AI may assist with research, summarising and drafting. Automated checks assess sourcing, accuracy and editorial risk before publication, and sensitive material is held for human review. Spotted something off, or want us covering a topic? Tell us. Your feedback is entirely optional and helps shape what we publish next.

The Daily Network · local news across AUS